Home / Practice questions / Type III
How should a low-pressure system be pressurized for leak testing?
Answer: By using controlled hot water or heating blankets, to no more than 10 psig. Raise the system pressure with controlled hot water or heating blankets, keeping it at no more than 10 psig so the rupture disc does not open.
The four choices
- With compressed air at 100 psig
- By using controlled hot water or heating blankets, to no more than 10 psig (correct)
- With oxygen
- With R-22 at full cylinder pressure
Memory trick: Ten to Test, Fifteen to Flip: leak test at 10 psig max, rupture disc bursts at 15.
Where it is taught
This question is part of the check at the end of the lesson Leak testing and recovery on low-pressure chillers, in the free Type III course.
Related Type III questions
- Before opening a low-pressure system for a non-major repair, how can its pressure be brought up to atmospheric?
- During a standing vacuum test on a low-pressure chiller, the pressure keeps rising. What does this indicate?
- What is the purpose of a purge unit on a low-pressure chiller?
Want more? Practice 10 new free Type III questions every day, or get all 494 questions in the Complete Kit.