EPA 608 Cheat Sheet: Key Numbers and Dates (2026)

These are the numbers that show up again and again on the EPA 608 exam. Print this page or save it to your phone.

Core

TopicNumber or rule
Maximum cylinder fill80% of volume (liquid)
Recovery cylinder colorsGray body, yellow top
Pressure for leak testingDry nitrogen with a regulator and relief valve. Never oxygen or compressed air.
Reclaimed refrigerant purityAHRI Standard 700, verified by chemical analysis
Ozone depletionCaused by chlorine (CFCs and HCFCs). HFCs have zero ODP.
A2LLower toxicity, lower flammability (R-32, R-454B)

Type I – Small appliances

TopicNumber or rule
Small appliance5 lb of refrigerant or less, factory-sealed
Recovery, equipment made after Nov 15, 1993, compressor works90% recovered, or 4 inches Hg vacuum
Recovery, equipment made after Nov 15, 1993, compressor does not work80% recovered, or 4 inches Hg vacuum
Open-book mail-in test84% to pass, does not count toward Universal

Type II – High pressure

TopicNumber or rule
Leak repair applies (ozone-depleting refrigerant)50 lb or more
Leak repair applies (HFCs, since Jan 1, 2026)15 lb or more, GWP above 53 (residential and light commercial AC exempt)
Leak rate thresholdsIndustrial process 30% · Commercial refrigeration 20% · Comfort cooling 10%
Time to repair30 days (120 days if an industrial process shutdown is needed)
Chronic leaker reportLoses 125% or more of full charge in a calendar year
Non-major repair, no evacuation after0 psig or lower before opening (5 psig for an oil change)

Required evacuation levels (equipment made on or after Nov 15, 1993)

ApplianceLevel
Very high pressure0 inches Hg
High pressure, less than 200 lb0 inches Hg
High pressure, 200 lb or more10 inches Hg
Medium pressure, less than 200 lb10 inches Hg
Medium pressure, 200 lb or more15 inches Hg
Low pressure25 mm Hg absolute

Type III – Low pressure

TopicNumber or rule
Rupture disc15 psig, on the evaporator
Leak test pressureNo more than 10 psig, raised with controlled hot water or heating blankets
Evacuation level25 mm Hg absolute
Heat oil before draining130°F
RechargingVapor first, then liquid, to keep water in the tubes from freezing

AIM Act dates (job knowledge, not on the 608 exam)

DateRequirement
January 1, 2026HFC leak repair (15 lb, GWP above 53) takes effect
January 1, 2027Old (2018) EPA 608 question bank no longer accepted; automatic leak detection for some large systems
January 1, 2028Used disposable cylinders must go to an eligible processor or be evacuated

Free 7-day EPA 608 email course

One short lesson a day for a week: the numbers you must know, a memory trick and 5 practice questions. We also tell you when the exam or the rules change. Unsubscribe anytime.

Always confirm details in the regulations: 40 CFR Part 82, Subpart F and 40 CFR Part 84.

More EPA 608 guides

Ready to test yourself?

Try free practice questions with explanations.

Start free practice